What is LEED Commissioning?
LEED Commissioning (Cx) is the process of verifying and optimizing a building’s systems to meet the energy efficiency and sustainability standards required for LEED (Leadership in Energy and Environmental Design) certification.
At Ziltose, we provide expert LEED commissioning services for new and existing buildings, ensuring they meet sustainability goals, reduce energy costs, and comply with green building standards.

-
Commitment to the Environment: More than a service, it is our dedication to sustainability.
-
Design Phase: Review documents for LEED compliance, focusing on energy modelling and sustainable materials.
-
Post-Construction Phase: Perform commissioning activities, including functional performance testing and LEED credit verification.
-
Pre-Design Phase: Collaborate with stakeholders to set sustainability goals and integrate LEED, WELL, and Sustainability requirements.
-
Construction Phase: Monitor activities to verify adherence to sustainability practices and conduct site inspections.
-
Operational Phase: Provide ongoing support, and training for facility staff, and implement maintenance best practices and compare the building performance is as intended.

What we offer
-
Assisting In Developing in Owner’s Project Requirements (OPR)
-
Assisting In Developing in Basis of Design (BOD)
-
Develop Preliminary Commissioning Plan.
-
Examine The OPR, The BOD, And the Design Documentation.
-
Create Commissioning (Cx) Specifications and Include Them In Construction Documents.
-
Update OPR, BOD, And Commissioning Plan.
-
Organize A Commissioning Launch Meeting.
-
Develop Construction Checklists.
-
Conduct Pre-Functional Inspections.
-
Create Scripts for Functional Tests.
-
Implement Functional Testing.
-
Keep A Record of Results.
-
Prepare Commissioning Report.
-
Prepare/ Review Training Manuals.
-
Prepare/ Review Operation and Maintenance Manuals

Why Choose Ziltose for LEED-Commissioning?
✅ Expert LEED Consultants: Certified professionals with extensive experience
✅ Optimized Energy Performance: Achieve 30-50% energy savings
✅ Faster LEED Certification: Streamlined documentation and compliance
✅ Sustainable Cost Savings: Reduce long-term operational costs
✅ Regulatory Compliance: Meet ASHRAE, USGBC, and ISO green building standards
-
What is data center commissioning, and why is it important?Data center commissioning is a structured process that ensures all critical systems (power, cooling, IT infrastructure) function as designed before going live. It minimizes the risk of failures, enhances uptime, and ensures compliance with Uptime Institute, ASHRAE, and ISO standards.
-
What are the different levels of commissioning (L1 to L5) in a data center?Commissioning is divided into five levels: Level 1 – Factory Acceptance Testing (FAT): Equipment testing before shipment. Level 2 – Site Acceptance Testing (SAT): Verifying installation at the site. Level 3 – Pre-Functional Testing (PFT): Initial testing of individual systems. Level 4 – Functional Performance Testing (FPT): Integrated system performance testing. Level 5 – Integrated System Testing (IST): Full-scale operational testing under real-world conditions.
-
What is the role of a commissioning agent in data center projects?A commissioning agent (CxA) ensures that the facility meets its design intent by overseeing installation, testing, and performance validation. They act as an independent third party to verify compliance with standards and project specifications.
-
What are the Uptime Institute commissioning requirements for Tier III & Tier IV data centers?The Uptime Institute mandates rigorous testing protocols, including redundancy validation, integrated system testing, and failure scenario simulations to ensure reliability for Tier III (N+1) and Tier IV (2N+1) data centers.